Refurbish a lawn |
||
![]() |
![]() |
![]() |
| typical Adelaide lawn after drought | Using the mud bucket on the excavator scrape off 100mm of top soil | Move soil off the site of the working area |
![]() |
![]() |
![]() |
| lay the netafim drip line irrigation piping | test the soil Ph and adjust, typically with gipsom for Adelaide then replace top soil and adjust the drip line to the correct spacing as you replace the soil | fertilise soil with organic lawn food,sow the grass seed, turn on the automated irrigation system |
![]() |
![]() |
![]() |
| 6 days later | 2 weeks later | 1 month later |
Build a sleeper retaining wall |
||
![]() |
![]() |
![]() |
| having marked out the positions of the retaining post bore the holes.typically the post needs to be the same depth below the ground as it is above. so for a 1 meter retaining wall use a 2 meter post. | concrete the posts in using a mix 9:1 20mm rubble to portland crement | Fit the sleepers into the steel posts |
![]() |
![]() |
|
| cover the rear of the retaining wall with a water proof membrain before back filling. | plant up and stand back | |
Need to do a spot of gardening, now this is fun |
||
![]() |
![]() |
![]() |
| shrub removal | 2 | 3 |
![]() |
![]() |
![]() |
| 4 | its that quick | and dump |